Central Moving provided project management, warehousing, and asset management along with the delivery and installation of all FF&E for the newly constructed AC Hotel by Marriott at 260 West 40th Street.
Challenge: All furniture, fixtures, and equipment (FF&E) for this new 300-key hotel were delivered to the Central Moving warehouse, along with long-lead-time construction materials and back-of-the-house supplies. As the construction of each floor was completed, we delivered and installed all of the FF&E.
Central Moving: Our project team and warehouse operations group were painstakingly detail-oriented in the receiving, inspection, delivery, and installation of the myriad items constituting the hotel’s individual rooms and public spaces. Our daily updates and weekly meetings with the developer and design team were augmented by our state-of-the-art inventory system, which provided the client with accurate, up-to-the-hour inventory and status reports. The team routinely accessed our online system, which showed photos of each item and gave precise activity reports verifying when a piece came into the warehouse and when it went out.